Jul 22, 2025
- Deepway 6×4 Star (NZ)
- Battery CATL 600kWh (LFP)
- Tare 11,900kg
- GCM 49,000kg
- Duration 400km at 49t
- Power 224kW continuous, 492kW peak
- Torque 30,000Nm continuous, 75,000Nm peak
- 4 speed integrated e-axles with sequential shifting (one axle then the other)
- Includes EPTO hydraulics built into the e-axles
- Airbag rear suspension
- Battery warranty 8 years or 1.5 million km


Apr 7, 2025
- Robotic battery swapping in 5 minutes
- 4 x 240kW chargers
Sep 1, 2024

- Etrucks 4 x 2 FCEV
- 18 tonne GCM
Aug 1, 2024



- Etrucks 6×4 FCEV
- GCM 58t
- Tare 10,950kg
- Bosch 250kW fuel cell
- 2200l H2 (350 bar), 50kg H2 storage
- 58kWh battery
- Bosch drive axles
- 378kW continuous
- 530kW peak available
- Integrated 4 speed auto.
- Duration loaded around 500km
Jul 30, 2024
- 3.t dual drum roller
- 35kWh battery
- Four hours run time